High Speed Internet is on it's way.

I called CLP today and asked about the status of the towers. Kevin said that he was doing a lot of paperwork with contracts and zoning. The sites have been identified on lands by two private owners. He hopes the towers will go live by this summer/early fall. The tower at the north end of Pequaywan Lake could boost a 700Mhz tower which would serve as far as Stony, White and Alden Lakes with a 7-8 mile reach. If the lower Mhz towers go up they have a 1 1/2 mile radius and would be placed at each end of Big and Little Pequaywan. 

The geese, eagles, and ducks have arrived last week with the balmier temperatures. We have received some snow, but spring is finally here.